C.D.K. Tegel-, Timmer- en Bouwwerkzaamheden - 1e Kruisstraat 8
4/5
★
based on 8 reviews
Contact C.D.K. Tegel-, Timmer- en Bouwwerkzaamheden
Address : | 1e Kruisstraat 8, 1521 VP Wormerveer, Netherlands |
Phone : | 📞 +7 |
Postal code : | 1521 |
Categories : | |
City : | Wormerveer |
R
|
Rens Zijlstra on Google
★ ★ ★ ★ ★ |
D
|
Dick van der Heide on Google
★ ★ ★ ★ ★ |
D
|
Danny Ruiter de on Google
★ ★ ★ ★ ★ |
M
|
Mousaa Almoussa on Google
★ ★ ★ ★ ★ |
E
|
Edward B on Google
★ ★ ★ ★ ★ C.D.K. Wormerveer van "Carl de K." heeft bij ons een kleine douche/wasbak ruimte vernieuwd en aangepast naar een douche/ toilet.
Voorwerk:
De dag dat er was afgesproken niks (zonder afbericht), de 2e dag "sorry me bus start niet" (de hele dag?), op de 3e dag stond Carl op de stoep om te slopen.
- De stukadoor heeft circa 30% van het oude stukwerk alsnog zelf verwijderd, Carl vond zelf dat dit wel kon blijven zitten.
- Na montage liep de rioolafvoer onder het plafond 1,5 cm op, i.p.v. af, dit werd na aandringen verholpen.
- Ik moest staan op het gebruik van een stevig achterschot i.p.v. een enkel plafond gipsplaatje achter het toilet. (Het werd een dun houtplaatje, die (bleek achteraf) ondeugdelijk met een latje van 2x3 cm en wat lijm was gemonteerd).
- Het plafond wat vernieuwd zou worden kon blijven zitten werd eenzijdig door Carl besloten (waardoor de stukadoor alles moest afschuren).
Het tegelen kon starten:
Hier kreeg ik er weer wat vertrouwen in, Carl kon goed en netjes tegelen dat ging prima! Ik blij dat het dan toch de goed kant op ging.
Montage:
- Na het tegelen bleek de thermostaat kraan niet helemaal recht bij montage.
- De rozetten van de kraan paste niet goed en werden met kit vastgezet.
- Er mist een stukje houten afwerking langs het de draai/kiepraam.
- De schuifdeur en de pot etc. werden gemonteerd, maar de bril zat los en de pot/wand kraakt.
De bril werd een paar dagen erop alsnog vastgezet en de pot met nog wat extra kit langs de rand gelijmd. Zijn werk was klaar.
Het tegelwerk was goed, en de rest oogde redelijk, dus heb ik hem voldaan.
****
HELAAS, de volgende ochtend drupte er water beneden. U snapt het al, lekkage!
Carl een berichtje gestuurd en s'middags werden we gebeld dat hij gelijk wilde komen. Dat klonk goed, alleen liepen we in Artis. Die maandag teruggebeld en hoe anders liep dat gesprek: hij had geen tijd en het eindigde met "bekijk het maar". Boos en enigszins verbluft heb ik later een berichtje gestuurd in de trant van: wees nu zakelijk en los het alsjeblieft op. Daarna werd het stil, ook op wat extra berichtjes en mails geen reactie.
Later bleek dit ook nog mis:
- Toiletrol houder kwam van de muur.
- Radiator zat los en op het (afgewerkte) stuc werk zaten grote potloodkringen.
Uiteindelijk weinig andere keus dan zelf actie ondernemen en een loodgieter laten komen. De lekkage zat achter de wand en de hele achterwand met toiletpot moest er dus weer uit. Het sloop werk heb ik zelf maar gedaan en de loodgieter heeft het leidingwerk en de toiletpot hersteld, nu wel gelijk met een deugdelijke achterwand (het kraken was ook over).
Ondertussen kreeg ik Carl nog een keer te pakken en gelijk gevraagd of hij dan in ieder geval het tegelwerk kon herstellen, dat was goed. Echter toen het zover was kreeg ik opnieuw een grote mond. Weer geen tijd en na mijn opmerking, "misschien moet je dan nu even wat tijd maken" kreeg ik wederom te horen "bekijk het maar". Uiteindelijk heb ik het tegelwerk zelf hersteld.
Achteraf heb ik nog een mail gestuurd met een opsomming van de kosten, loodgieter, extra tegels, PVC, lijm etc. en het verzoek hier +- 2/3 van bij te dragen.
Hierop kreeg ik een onbeschofte reactie, met als afsluiter: Ik moet niks, alleen schijten moet ik en 'De krullen'. Nou inderdaad goed van toepassing op Carl want hij heeft letterlijk schijt aan alles.
U bent dus gewaarschuwd.
Ondanks alles toch 2 sterren: want 1 ding moet ik toegeven, Carl kan wel tegelen.
C.D.K. Wormerveer from "Carl de K." has renovated a small shower / sink room with us and adapted it to a shower / toilet.
Preliminary work:
The day that there was nothing agreed (without cancellation), the 2nd day "sorry my bus doesn't start" (all day?), On the 3rd day Carl was on the doorstep to demolish.
- The plasterer has removed about 30% of the old plasterwork himself, Carl thought that this could be left in place.
- After installation, the sewer drainage under the ceiling rose 1.5 cm, instead of decreasing, this was remedied after insistence.
- I had to insist on using a sturdy rear bulkhead instead of a single ceiling plasterboard behind the toilet. (It turned out to be a thin wooden plate, which (turned out to be) faulty with a 2x3 cm strip and some glue).
- The ceiling that would be renewed could remain in place was decided unilaterally by Carl (so that the plasterer had to sand everything down).
Tiling could start:
Here I gained some confidence again, Carl could tile well and neatly, that went fine! I'm glad things went in the right direction after all.
Edit:
- After tiling, the thermostat tap turned out not to be completely straight when mounted.
- The tap rosettes did not fit properly and were fixed with sealant.
- A piece of wooden finish is missing along the turn / tilt window.
- The sliding door and the pot etc. were mounted, but the glasses were loose and the pot / wall creaks.
The glasses were fixed a few days later and the jar glued along the edge with some extra sealant. His work was done.
The tiling was good, and the rest looked reasonable, so I satisfied him.
****
UNFORTUNATELY, the next morning water was dripping down. You got it, leakage!
Carl sent a message and in the afternoon we were called that he wanted to come right away. That sounded good, we just walked in Artis. Called back that Monday and how different was that conversation: he had no time and it ended with "just look at it". Angry and a little taken aback, I later sent a message along the lines of: be business now and please fix it. Then it became silent, also no response to some extra messages and mails.
Later this also turned out to be wrong:
- Toilet roll holder came off the wall.
- Radiator was loose and the (finished) plaster work had large pencil circles.
In the end, little choice but to take action yourself and have a plumber come. The leak was behind the wall and the entire back wall with toilet bowl had to be removed again. I did the demolition work myself and the plumber repaired the piping and the toilet bowl, now with a proper back wall (the creaking was also over).
In the meantime I got hold of Carl again and immediately asked if he could at least repair the tiling, that was good. However, when the time came, I got a big mouth again. Again no time and after my comment, "maybe you should make some time now" I was again told "just look at it". In the end I repaired the tiling myself.
Afterwards I sent an email with a summary of the costs, plumber, extra tiles, PVC, glue etc. and the request to contribute + - 2/3 of this.
I got a rude response, ending with: I don't have to do anything, I just have to shit and 'The curls'. Well indeed applies to Carl because he literally shits about everything.
So you have been warned.
Despite everything 2 stars: because 1 thing I have to admit, Carl can tile.
|
E
|
E. Geertsema on Google
★ ★ ★ ★ ★ Ik heb helaas dezelfde ervaringen als de heer Bergevoet. Het tegelwerk en vloeren leggen doen ze goed maar daarna begint de ellende. Een opsomming van de gebreken: de douchebak zakte door want die was niet goed bevestigd, de inbouwunit van de douche hebben ze op zijn kop in de muur geplaatst en de aansluitingen verkeerd gemonteerd terwijl de handleiding duidelijk aangaf hoe een en ander uitgevoerd moest worden. Toen ik thuiskwam van vakantie en alles klaar zou moeten zijn kwam er (midden in een hittegolf) geen water uit de douche. Carl gaf zoals gewoonlijk de materialen de schuld. Ik heb een (dure) loodgieter moeten inhuren om de puinhoop te herstellen.
Verder zijn de mozaïektegels in de douche zonder primer of wat dan ook los op een gipsen wand geplakt. Dat is dus wachten op lekkage. De sifon onder de wasbak zat er los in en viel er na een week af. Kranen zijn scheef/niet waterpas gemonteerd. De ventilatiegaten in het verlaagde plafond zijn niet verbonden met de afvoerbuizen.
Voor de badkamer heb ik dure afwasbare verf gekocht. De door de heer De Klonia ingehuurde schilder heeft goedkope latex gebruikt en mijn dure pot waarschijnlijk meegenomen. De elektra is ondeugdelijk/onveilig aangesloten.
Toen ik een slechte recensie plaatste op de website waar zij hun klanten vandaan halen ben ik telefonisch bedreigd. Ik ben inmiddels toe aan de derde aannemer en duizenden euro's armer om de schade te herstellen. Een gewaarschuwd mens telt voor twee!
Unfortunately, I have the same experiences as Mr Bergevoet. They do the tiling and floors well, but then the trouble starts. A summary of the defects: the shower tray sagged because it was not properly attached, they placed the shower's built-in unit in the wall upside down and the connections mounted incorrectly, while the manual clearly indicated how to do this. When I got home from vacation and everything should be ready (in the middle of a heat wave) no water came out of the shower. Carl, as usual, blamed the materials. I had to hire an (expensive) plumber to fix the mess.
Furthermore, the mosaic tiles in the shower have been glued to a plaster wall without primer or whatever. That is waiting for leakage. The siphon under the sink was loose and fell off after a week. Taps are mounted crooked / not level. The ventilation holes in the false ceiling are not connected to the drain pipes.
For the bathroom I bought expensive washable paint. The painter hired by Mr. De Klonia used cheap latex and probably took my expensive pot with him. The electricity is incorrectly / unsafe connected.
When I posted a bad review on the website where they get their customers from, I was threatened by phone. I am now ready for the third contractor and thousands of euros poorer to repair the damage. A warned person counts for two!
|
s
|
saskia stoker on Google
★ ★ ★ ★ ★ Carl heeft snel gewerkt, prachtig tegelwerk (zie foto's) en de opdracht ruim op tijd afgeleverd conform afspraken. De klus was ruim, 2 badkamers en 1 toilet. Carl heeft gelijk het toilet gemaakt zodat we in het nieuw bouw huis direct daar gebruik van konden maken.
Carl worked quickly, had beautiful tiling (see photos) and delivered the assignment well on time in accordance with agreements. The job was spacious, 2 bathrooms and 1 toilet. Carl immediately made the toilet so that we could use it directly in the new construction house.
|
A
|
Amaia Arrieta Rey on Google
★ ★ ★ ★ ★ Carl did a very good job putting some tiles in the kitchen. He is very professional. We will call him again for future works! I totally recommend him.
|
Write some of your reviews for the company C.D.K. Tegel-, Timmer- en Bouwwerkzaamheden
Your reviews will be very helpful to other customers in finding and evaluating information
Nearby places in the field of Contractor,
Nearby places C.D.K. Tegel-, Timmer- en Bouwwerkzaamheden